Factory Price Customized Colored Cold Roof Tile Making Machine/Glazed Roof Tile Machine/Step Tile Metal Roofing Sheet Roll Forming Machine Price Manufacturers

ROLL FORMING MACHINE FOR YX35-192-960 TILE ROOF   1.The Chart of Process Flow   Profile2. Technical Parameters (1) 5Tons manual un-coilerDescription There are different choices, please turn to the catalogue of un-coiler(2) Entry bench & Manual Pre-shearing device FunctionSmart cut control, to cut off the end of the final piece of sheet onlyShearing ThicknessUp to Max. 0.8mm (if thickness > 0.8mm, then hydraulic pre-shearing device or electric pre-shearing device instead )(3) The general machine parameterSuitable roll forming materialColor steel sheet or AluminumThickness0.4mm-0.6mmFeeding width1219mmFrame designWall-plate-frame-design /New-stand-frame-designRoll stages18 stagesMaterial of forming roller45# steel, CNC lathes, Hard Chrome CoatedShafts DiameterΦ75 mmMain motor power7.5KW with reducerMax. Line speed of roll former Approx. 4m/min (stair length 350mm, production length 6m)Hydraulic Stair-Drawing & Cutting DeviceThere is one hydraulic press to make the stair according to requirement and hydraulic post cut for cut offHydraulic group power11KWMaterial of cutting bladeCr12, heat treatment Electric Standard380V /50Hz/3PH or as the customer's requirementsMachine Dimensions 9430mm×1960mm×1650mmMajor Color of Machine PaintedRAL 5015 (Blue) or as per customer's requirements(4)  PLC Control system  PLCSiemens brand Touch ScreenSiemens brand InverterSchneider brand Encoder Omron brand(5) Product rack  Descriptionun-powered, 3 units(6) Options for tile roof :A.Hydraulic pre-shearing deviceB.Improvement for driving system for Tile roofServo motor instead of AC motor for the roll former, to increase the production speed and the tolerance between two stairsDriving system with gear box and redirector for every three/four stages to improve the speed and tolerance control. Sprocket driving between each three/four stages.(7) About usPlease visit the web site: liming2018.en.made-in-china.com for detailed informationAfter-Sale Service  In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:If installation is needed, we will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.The buyer should assist us to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians.Terms Of TradePackage & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory./* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1