Ultra Low Temperature Two Stage Water Heating Air Source Heat Pump

Heat Pump Air to Water Converter with Europe Energy LabelsProjectUnitR134a UnitsR22 UnitsEnvironmental sideDry bulb temperatureºC  -35-21ºC  -35-21ºCUse side Water outlet temperatureºC  35-70ºC  35-55ºCWater flowm3/hRated Flow±15%Rated Flow±15%Allowable voltage rangeVRated voltage±5%Rated voltage±5%Three-phase voltage imbalance rate/±2%±2% Allowable frequency rangeHZRated frequency±2%Rated frequency±2%Note if water outlet temperature is higher than 70ºC ModelKMAD-100KMAT-150KMAT-200KMAT-240KMAT-280KMAT-330The refrigerantR134aHeatingKW100150200240280330Input power(rated condition)KW38557085100113power supply 3φ-380V-50HZprotective deviceReverse phase loss protection, over current protection,motor temperature protection, high and low voltage protection,high and low temperature protection, water flow protectionRefrigeration circuit1Energy control (%)0,50,75,100Refrigerant charge (kg)100150160180200220Finned heat exchangerCopper tube wearing hydrophilic corrugated aluminum sheetFanFormAxial FlowFlow (m3/h)60000600009000090000120000120000Power (kw)66991212Water side maximum pressure MPaFormShell and tube heat exchangerWater side maximum pressure MPa1 Import and export pipe diameterDN65DN80DN100DN100DN125DN125Hot water flow17.225.834.441.34956.8Water pressure drop384245485255Running noisedB(A)757778808182Unit length(mm)336033605000500060006000Unit width(mm)226022602230223022302230Unit height(mm)250025002500250025002500Unit weight(kg)400043006400670081008500Running weight(kg)4500480070007300870092001. According to GB/T 25127.1-2010, the nominal heating standard: ambient dry bulb temperature -12°C,ambient wet bulb temperature -14°C, hot water outlet temperature 41°C, water flow 0.172 m3 / h * kW;2, The ambient temperature range: -25 ° C ~ 21 ° C; Tot water temperature range: 35°C ~ 70°C;3. The unit parameters are subject to change without prior notice. The specific parameters are subject to the product nameplate;4. KMAD-100 unit is a heating and cooling unit, GB/T 25127.1-2010 national standard nominal cooling capacity is5. ★ for the upcoming product model. ModelKMAT-130A*KMAT-190A*KMAT-290A*KMAT-350AKMAT-350AVThe refrigerantR22HeatingKW130190290350350Input power(rated condition)KW456598118120power supply 3φ-380V-50HZprotective deviceReverse phase loss protection, over current protection,motor temperature protection, high and low voltage protection,high and low temperature protection, water flow protectionRefrigeration circuit1Energy control (%)0,50,75,100Refrigerant charge (kg)160180200220220Finned heat exchangerCopper tube wearing hydrophilic corrugated aluminum sheetFanFormAxial FlowFlow (m3/h)6000090000120000120000120000Power (kw)69121212Water side maximum pressure MPaFormShell and tube heat exchangerWater side maximum pressure MPa1 Import and export pipe diameterDN80DN100DN125DN125DN125Hot water flow22.432.74960.260.2Water pressure drop4548525555Running noisedB(A)8080828585Unit length(mm)35005000600060006000Unit width(mm)22302230223022302230Unit height(mm)25002500250025002500Unit weight(kg)45006200800085008500Running weight(kg)500067008700900090001. According to GB/T 25127.1-2010, the nominal heating standard: ambient dry bulb temperature -12°C,ambient wet bulb temperature -14°C, hot water outlet temperature 41°C, water flow 0.172 m3/h*kW;2. The ambient temperature range: -35°C ~21°C; Tot water temperature range: 35°C ~55°C;3. The unit parameters are subject to change without prior notice. The specific parameters are subject to the product nameplate.4. ★ for the upcoming product model. FAQQ1: Are you factory or trade company?  A1: We are factory.Q2: What the exactly address of your factory? A2: Our company is located in No. 6767, Tingfeng Rd. Jinshan District, Shanghai 201502, ChinaAnd our factory is located in No. 366, YangzhuangBang Street, Pingxing Rd., Xindai Town, Pinghu, Zhejiang Province, China. Q3: Warranty terms of your machine? A3: Two years warranty for the machine and technical support according to your needs.Q4: Will you provide some spare parts of the machines? A4: Yes, of course.Q5: How long will you take to arrange production? A5: 380V 50HZ we can delivery the goods within 10 days. Other electricity or other color we will delivery within 22 daysQ6: Can you accept OEM orders? A6: Yes, with professional design team, OEM orders are highly welcome.